BEJS Bridge Expansion Joint Test Case Study:
Illinois DOT on I-155 Lincoln, Illinois
(October 2011)

Replacement of failed Bolt-Down expansion joints with EMCRETE and BEJS


Tech Data (.pdf)

Install Data (.pdf)

Product Summary (.pdf)

Guide Spec (.doc)

CAD

Sample Request

Checklist (.pdf)

Resize, Rebuild, Reseal

Sizing Bridge Expansion Joints

Project References


Click on images to enlarge    
(L) Bridge on Interstate I-155 maintained by the Illinois Dept. of Transportation (IDOT)

(R) Repairs are mandated to the existing expansion joints as part of ongoing bridge preservation work.

(L) Example of common condition in roadways to damaged EPDM anchor-block "bolt-down" expansion joints installed in concrete surface blockouts.

(R) Existing Bolt-Downs have been removed, the blockouts have been re-cut or chipped clean, leaving well-defined blockouts and cleared expansion gaps.
7:30 AM

(L) Temporary center retaining forms are placed in the expansion gap to contain the flow of EMCRETE nosing material which will be poured in the blockouts.

(R) Blockouts receive final shop-vac for removal of loose particles and debris.

8:15 AM

(L) Blockouts are brush-primed with EMSEAL's EMPRIME primer.

(R) IDOT crew assembles EMCRETE nosing materials prior to mixing and installation.

EMCRETE Nosing Material is mixed in two consecutive stages.

(L) 1.  Parts A & B EMCRETE are mixed together.

(R) 2. Sand/Fiber is added to A/B mixture complete EMCRETE material.

8:30 AM

(L) EMCRETE is poured into blockout.

(R) Self-leveling EMCRETE nosing material quickly hardens to create a new impact-absorbing substrate.

Center forms are then removed exposing expansion gap.

12:30 PM

(L) After epoxy has been applied to the substrate walls, BEJS Expansion Joint sticks are placed into the expansion gap.

(R) BEJS sticks are joined together and then pushed down into gap.
(L) Silicone corner bead is injected between BEJS stick and substrate to complete the seal.

(R) View of finished EMCRETE header with BEJS expansion joint.
 

2:00 PM

BEJS Expansion Joint System


View of finished travel lane of I-155 at the Sugar Creek bridge in Lincoln/Hartwell, Illinois. Ready for traffic.


 

Meet online with EMSEAL:

Infrastructure Expansion Joints and Joint Sealants by EMSEAL

1-800-526-8365 -- 508-836-0280 --  techinfo@emseal.com -- Fax: 508-836-0281

EMSEAL JOINT SYSTEMS LTD. 25 Bridle Lane, Westborough, MA 01581
EMSEAL LLC. 120 Carrier Drive, Toronto, ON M9W 5R1

Last Modified: May 21, 2012



** Application for EMSEAL Credit **

Copyright © 1998-2012 by EMSEAL Joint Systems, Ltd. All rights reserved.
This document may not be reproduced in whole or in part without permission.