***COMPLETE GUIDE SPECIFICATION***
SECTION 07 90 00 and 07 95 00 (formerly 05810 / 07102 / 07915)--
SEALANTS, CAULKING, & SEALS
Application: Traffic Durable,
Watertight, 2-Hour Fire-Rated Expansion Joints--Basis of Design:
EMSHEILD DFR2
USA &
INTERNATIONAL: EMSEAL JOINT SYSTEMS, LTD, 25 Bridle Lane
Westborough, MA 01581-2603,
Toll
Free: 800-526-8365 or PH: 508-836-0280, FX: 508-836-0281,
www.emseal.com.
CANADA: EMSEAL CORPORATION, 120 Carrier Drive, Toronto, Ontario,
Canada, M9W 5RI Toll Free: 800-526-8365 or PH: 416-740-2090, FX:
416-740-0233,
www.emseal.com
PART 1 – GENERAL
1.01
RELATED DOCUMENTS
A.
The requirements of the GENERAL
CONDITIONS, SUPPLEMENTARY CONDITIONS and DIVISION 1 GENERAL
REQUIREMENTS apply to the work of this section.
1.02
DESCRIPTION
A.
EMSHIELD DFR2 SYSTEM – Traffic durable,
watertight, 2-Hour rated expansion joint by EMSEAL Joint Systems for
expansion joints and isolation joints in decks. Typical locations
include, but are not limited to the following: applications for
joints over occupied space, below-grade, stair tower perimeters,
elevator perimeters, stadium tread and risers, ice-floor perimeter
joints, parking deck joints, treatment plant perimeters and caps,
bridge joints, and structural expansion joints where a 2-hour fire
rating is required or desired. System shall perform waterproofing,
fire-rating, traffic bearing and movement-accommodation functions as
the result of a single installation and without the addition of
ancillary fire-blankets, mineral wool, coverplates, etc.
1.03
RELATED WORK SPECIFIED ELSEWHERE
A.
CONCRETE
1.04
QUALITY ASSURANCE
A.
Manufacturer's Instructions: In
addition to requirements of these specifications, comply with
manufacturer's instructions and recommendations for all phases of
work, including preparation of substrate, applying materials, and
protection of installed units.
1.05
SUBMITTALS
General: Submit the following in accordance with
(Designer: Insert appropriate
section reference for submittals).
A. Product data in the form of manufacturer's product
specifications, installation instructions, and details for each type
of expansion joint sealant system indicated.
B. Samples
of same materials to be used in work including certification by
Underwriters Laboratories (UL) that product has been tested and
certified for UL 2079 and meets the requirements of ASTM E1966, ASTM
E119 and ASTM E1399.”
1.06
PRODUCT DELIVERY, STORAGE AND HANDLING
A. Deliver
materials as factory packaged, sealed, and labeled. Handle and
protect as necessary to prevent damage or deterioration during
shipment, handling and storage.
B. Follow
any special instructions by manufacturer or manufacturer’s
representative.
1.07
PROJECT CONDITIONS
A. Substrate
Condition:
Proceed with work only when substrate construction and preparation
work is complete and in condition to receive sealant system.
B. Weather
Conditions:
Perform work only when existing and forecasted weather conditions
are within the guidelines established by the manufacturer of the
sealant system.
PART 2 – PRODUCTS
2.01
ACCEPTABLE MANUFACTURERS
A. Manufacturers
known to be able to supply materials as specified:
EMSEAL JOINT SYSTEMS, LTD,
25 Bridle Lane Westborough, MA 01581-2603, Toll Free: 800-526-8365
or PH: 508-836-0280, FX: 508-836-0281,
www.emseal.com.
CANADA: EMSEAL CORPORATION, 120 Carrier
Drive, Toronto, Ontario, Canada, M9W 5RI Toll Free: 800-526-8365 or
PH: 416-740-2090, FX: 416-740-0233,
www.emseal.com
2.02 MATERIALS
A.
EMSHIELD DFR2 SYSTEM – Sealant system shall be comprised of three
components: 1) fire-retardant-impregnated precompressed foam
pre-coated on the underside with an intumescent fire-proofing
material and pre-coated on the traffic surface with highway-grade,
fuel resistant silicone; 2) field-applied epoxy adhesive primer, 3)
field-injected silicone sealant bands. Impregnation agent to have
proven non-migratory characteristics. Silicone coating to be
highway-grade, low-modulus, fuel resistant silicone applied to the
impregnated foam sealant at a width greater than maximum allowable
joint extension and which when cured and compressed will form a
bellows. Product must be proved to have been tested and UL/ULC
certified by Underwriters Laboratories to the joint-cycling and fire
testing standards of UL 2079.
B.
EMSHIELD DFR2 foam seal to be installed
into manufacturer-supplied field-applied epoxy adhesive. The
EMSHIELD DFR2 SYSTEM is to be installed slightly recessed from the
surface such that when the field-applied injection band of silicone
is installed between the substrates and the
foam-and-silicone-bellows, the system will be essentially flush with
the substrate surface. Material shall
be capable of movements of +25%, -25% (50% total) of nominal
material size. Standard sizes from 1” (25 mm) to 4” (100mm).
Depth of seal is 4” (100mm).
C.
Substitute candidates in addition to
having been certified by UL according to UL2079, shall provide
certification in writing to be free in composition of any waxes or
asphalts, wax compounds or asphalt compounds. All substitute
candidates shall be certified in writing to be: a) capable of
withstanding 150°F (65°C) for 3 hours while compressed down to the
minimum of movement capability dimension of the basis of design
product (-25% of nominal material size) without evidence of any
bleeding of impregnation medium from the material; and b) that the
same material after the heat stability test will self-expand to the
maximum of movement capability dimension of the basis-of-design
product (+30% of nominal material size) within 24 hours at room
temperature 68°F (20°C).
D.
Factory-fabricated universal-90-degree
termination and transition units shall be used to terminate all
joints into vertical plane surfaces (walls, parapets, ends of decks,
etc) as well as to transition the material through curbs, treads and
risers or other in-slab plane changes. Universal-90-degree
termination and transitions pieces to be single units containing
minimum 12-inch long leg and 6-inch long leg on each side of the
direction change. Both the top and bottom surfaces of the entire
unit to be continuously coated with both the intumescent bellows and
over that, the traffic-grade silicone bellows. Termination pieces to
have the top of the 6-inch leg factory-mitered and bellows-coated at
45-degrees to provide a transition point to vertical-grade
materials, or when installed as a downturn termination at deck edges
to act as a drip edge. Factory-fabricated units to be field-joined
to straight lengths in accordance with manufacturer’s prescribed
methods and supplied joining materials.
PART 3 – EXECUTION
3.01
INSPECTION
A.
Joint surfaces to receive seal shall be
sound, smooth, straight, parallel, clean, dry and free of all
visible contaminants. Applications of non-visible coatings or
contaminants to surfaces of joint interface area prior to
installation of seal shall be controlled by the Architect/Engineer
in consultation with the expansion joint manufacturer.
B. The
joint configuration and the joint surfaces shall be as detailed in
the drawings and in accordance with the contract specifications and
in compliance with requirements in the current material Tech Data
available from the Manufacturer. All known detrimental conditions
shall be reported immediately in writing. Field measurements of the
depth and width of the joint shall be supplied to manufacturer
before material is ordered.
3.02
INSTALLATION
A. Do not proceed with the installation of joint sealer
if the joint is other than designed, until written notification of
these conditions is submitted to the manufacturer and design
professional, and a written acknowledgement with an order to proceed
is provided.
B. Do not proceed with the installation of joint sealer
under adverse weather conditions when joint to be sealed is damp,
wet or frozen, or when temperatures are below or above the
manufacturer's recommended limitations for installation. Consult
manufacturer for specific instructions before proceeding.
C. Joint sealer/expansion
joint material to be installed in strict accordance with the
manufacturer's instructions and the advice of their official
representative.
3.03
CLEANING AND PROTECTION
A. Remove
all waste materials from site. Leave work in a condition
satisfactory to the Architect/Engineer.
END
OF SECTION |